EACL-SL-01 v2

Congestion management in distribution grids under market conditions

1. Description of the Use Case

1.1. Name of the Use Case

IDArea /Domain(s)/Zone(s)Name of the Use Case
1Energy market,EACL-SL-01 v2

1.2. Version Management

Version No.DateName of author(s)ChangesApproval status
12021-02-17T00:00:00Rok Lacko (GEN-I),draft-concept
22021-04-28T00:00:00Nermin Suljanović (EIMV),Domain, Roles, BUC description, SUC list without detailed description

1.3. Scope and Objectives of Use Case

ScopeDemonstrate effectiveness and appropriateness of flexibility services for the congestion management of a distribution grid, under market conditions. The flexibility tested with this BUC can also be utilised for mFRR at the balancing market. This BUC will validate a process in which managing flexibility in the distribution grid (e.g. switching of heat pumps) can prevent that distribution grid overreaches it’s physical limits (e.g. transformer overheating, line congestion). It will also verify information exchange between all stakeholders in this process enabling data as well as communication interoperability, under flexibility market conditions.
Objective(s)Deferral of grid reinforcement investments (defer or avoid secondary substation replacement) Improve security of supply Validate demand response mechanism to prevent congestion in the distribution grid. Test flexibility products to prevent congestion in the distribution grid under market conditions.
Related business case(s)849dbc1f-3dd1-490c-9142-2de3c5595e1d 52052567-2a63-4a07-ac5f-4f373f93f743 f3f672bc-e797-4993-8a04-f4ccac11c676 0877ad60-6993-44df-b36b-abb447ecc4ef 313a3295-19b4-4deb-9b60-e60b92927ba5 3439f0c8-80f2-4896-bd40-be4556c85a91 ea73fd14-13f8-4eb6-864f-d68a35fac84f 25406cc5-5e1f-44a4-b976-b00268a38156 b82d8c40-9322-4bc9-bbea-ed6a2e492fbd

1.4. Narrative of Use Case

Short description

Due to excessive and increasing energy consumption, existing MV/LV secondary substations occasionally becomes thermally overloaded and power lines congested. Demand response services can be utilised to decrease duration or even prevent overloads of the distribution grid components. In particular, switching of the heat pumps in one substation area can be used to reduce the transformer load during peak hours. In regard how DSO procure this flexibility service, two scenarios are considered. In the first scenario, service provider (e.g. aggregator) enters into a contract with DSO for a long-term period. The second scenario assumes that local flexibility market exists and that DSO purchases flexibility service at the local flexibility market to resolve congestion problems in the distribution grid.

Complete description

In this BUC, DSO uses flexibility resources connected to the distribution grid to resolve congestion problem and postpone investment in the grid reinforcement. Depending on how local flexibility market is organised, two scenarios are considered.
The first scenario corresponds to over the counter market (OCM) in which flexibility service provider (FSP) make a long-term (e.g. 6 months) bilateral contract with DSO related. This first scenario includes the following processes:
· Prequalification: after DSO publishes a call for flexibility procurement, FSP sends a request for prequalification. Within this process, DSO evaluates technical info and optionally run tests (depending on the offered power and impact on the distribution grid) to confirm capability of FSP to deliver a service.
· Offering: when DSO identifies a need for the flexibility, DSO sends requests for offers. FSP send an offer. DSO collects and ranks the offer. After selection of the best offer, contract is signed.
· Activation: when congestion in the grid is predicted or occurred, DSO sends a request to FSP for contracted flexibility at a given location in the distribution grid. FSP acknowledges request and activates a service (e.g. reduces a consumption by switching off heat pumps).
· Settlement: using calculated base line, volume of the delivered power is calculated. This is volume is confirmed by both sides (e.g. check of error in measurements) and invoice is sent.
In the second scenario, DSO procures flexibility on the organised local flexibility market. This scenario includes the following processes:
· Grid prequalification: at the start of this process, flexibility resources are registered at the flexibility register. Flexibility register (component located at the market operator) initiates prequalification of the registered resource run by DSO, to validate existence of the resource and it’s impact on the distribution grid. The complexity of this procedure depends on the volume/power and the impact on the grid of the flexibility resources.
· Product prequalification: DSO defines the requirements that each local flexibility product should meet. Flexibility market operator (FMO) coordinates the prequalification process. Flexibility service provider sends the prequalification request with accompanying information to the FMO, who forwards this request to DSO. DSO runs predefined tests and calculation, after send the results and acknowledge FMO about the final decision. FMO stores this information to the flexibility register and acknowledges FSP
· Bidding: DSO expresses the need for the flexibility service to FMO (based on the load and distributed generation prediction and state of the distribution grid), which publishes request for bids. FMO collects the bids from flexibility service provides and selects the optimal bids. FMO sends information about selected bids to DSO, flexibility service provider, TSO and flexibility register.
· Activation: For the selected bid, activation is initiated by DSO sending activation signal to the flexibility service provider. FSP internally activates flexibility resources and acknowledges DSO. DSO informs TSO about activated flexibility resources in the distribution grid in order to avoid collision and double activation on the balancing market. During the activation, flexibility register (component of the market operator) collects the measurements from DSO and FSP.
Settlement: Flexibility register calculates the base line. After the activated product has been delivered, flexibility register calculates delivered volume and information to DSO and FSP. In the process of volume validation, DSO and FSP should validate delivered volume. When volume can’t be validated, alignment process is initiated. FMO monetizes the delivered flexibility product and send the bill to DSO and reimbursement to FSP.

1.5. Key Performance Indicatiors (KPI)

IDNameDescriptionReference to mentioned use case objectives
1A number of succefullz avoided congestions during demonstration periodcfdd65f6-46d4-45b2-8196-af55163fb078, 2e949073-a8b8-44e9-bfff-887322236bd9,

1.6. Use case conditions

Assumptions
Local flexibility market
Prerequisites
Flexibility service provider provides flexibilty services to DSO to avoid grid congestion problems

1.7. Further information to the use case for classification/mapping

Relation to other use cases
SUC
Level of depth
Prioritisation
Generic, regional or national relation
National relation
Nature of the use cases
BUC
Further keywords for classification
Flexibilty, Local flexibilty market, Congestion management

1.8. General remarks

General remarks

2. Diagrams of Use Case

BusinessUseCase1 - overview BusinessUseCase1 - scenarios flowchart

3. Technical Details

3.1. Actors

Actor NameActor TypeActor DescriptionFurther information specific to this Use Case
Transmission System Operator (TSO)BusinessAccording to the Article 2.4 of the Electricity Directive 2009/72/EC (Directive): "a natural or legal person responsible for operating, ensuring the maintenance of and, if necessary, developing the transmission system in a given area and, where applicable, its interconnections with other systems, and for ensuring the long-term ability of the system to meet reasonable demands for the transmission of electricity". Moreover, the TSO is responsible for connection of all grid users at the transmission level and connection of the DSOs within the TSO control area.
Source : EU Commission Task Force for Smart Grids, EG3
Distribution System Operator (DSO)BusinessA natural or legal person who is responsible for operating, ensuring the maintenance of and, if necessary, developing the distribution system in a given area and, where applicable, its interconnections with other systems, and for ensuring the long-term ability of the system to meet reasonable demands for the distribution of electricity.

Defined in the European Union Internal Electricity Market is legally defined in Article 2(29) of the Directive (EU) 2019/944 of the European Parliament and of the Council of 5 June 2019 on common rules for the internal market in electricity (recast),
Flexibilty Service Provider (FSP)BusinessDefined as any legal entity that offers flexibility services in the market, based on acquired (aggregated) capabilities, usually from third parties.
Market OperatorHarmonised RoleA market operator is a party that provides a service whereby the offers to sell electricity are matched with bids to buy electricity.

Additional Information:
This usually is an energy/power exchange or platform.
The definition is based on Regulation on the internal market for electricity (EU) 2019/943.

3.2. References

No.References TypeReferenceStatusImpact on Use CaseOrganistaor / OrganisationLink

4. Step by Step Analysis of Use Case

4.1. Overview of Scenarios

No.Scenario NameScenario DescriptionPrimary ActorTriggering EventPre-ConditionPost-Condition
1ActivationActivation of flexibilty service procured on the flexibility market.
2Activation-OTCDSO activates flexibility product to avoid congestion in the grid.
3BiddingFlexibilty Market Operator collects the bids from Flexibility Service Provider, for the flexibilty need published by DSO.
4Grid prequalificationRun by DSO to validate existence of the flexibility resource and evaluate impact on the distribution grid.
5OfferingFlexibility service provider (FSP) makes a long-term (e.g. 6 months) contract with DSO. This corresponds to the OTC market.
6PrequalificationOn OTC market, prequalification run by DSO only.
7Product prequalificationProcess is coordinated by the Flexibilty Market Operator (FMO).
8SettlementMonetisation of the delivered flexibilty product, procured on the flexibilty market.
9Settlement-OTCSettlement for the delivered flexibilty service on the OTC market.

Notes

4.2. Steps – Scenarios

Scenario Name:
Activation
Step No.Event.Name of Process/ ActivityDescription of Process/ Activity.ServiceInformation Producer (Actor)Information Receiver (Actor)Information ExchangedRequirements, R-ID
1.1Activate flexibility resource43f73de2-a6ba-4e46-bd78-30ef0dc89bfe
1.2Receive acknowledgement69dd2399-d76d-454e-a3f4-37196b34c973
1.3Receive activation info121e72c3-e0bf-4f21-8bee-75ca5af7a72d
1.4Receive activation measurement43f73de2-a6ba-4e46-bd78-30ef0dc89bfe
1.5Receive measurements9c168352-71a9-47ae-b1af-23ca6ceb29a8
1.6Send acknowledgement
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
43f73de2-a6ba-4e46-bd78-30ef0dc89bfe46d6ff86-bf6a-4027-9ea4-12d3a420399c
1.7Send activation info
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
69dd2399-d76d-454e-a3f4-37196b34c9737063e125-31d7-42b2-a270-7a0731b1db20
1.8Send activation signal69dd2399-d76d-454e-a3f4-37196b34c9733c1cb605-f58c-4958-814a-7a03a043659d
1.9Send real-time measurements
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
43f73de2-a6ba-4e46-bd78-30ef0dc89bfef0340b68-b92a-4663-bed7-764f15a472d4
1.10Send real-time measurements
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
69dd2399-d76d-454e-a3f4-37196b34c973f0340b68-b92a-4663-bed7-764f15a472d4
Scenario Name:
Activation-OTC
Step No.Event.Name of Process/ ActivityDescription of Process/ Activity.ServiceInformation Producer (Actor)Information Receiver (Actor)Information ExchangedRequirements, R-ID
2.1Activate flexibillity resources43f73de2-a6ba-4e46-bd78-30ef0dc89bfe
2.2Receive activation acknowledgment69dd2399-d76d-454e-a3f4-37196b34c973
2.3Receive activation request43f73de2-a6ba-4e46-bd78-30ef0dc89bfe
2.4Receive activation statusInformation about flexibility resource activation121e72c3-e0bf-4f21-8bee-75ca5af7a72d
2.5Receive measurements69dd2399-d76d-454e-a3f4-37196b34c973
2.6Send acknowledgementACK is sent to confirm reception of a document.
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
43f73de2-a6ba-4e46-bd78-30ef0dc89bfe46d6ff86-bf6a-4027-9ea4-12d3a420399c
2.7Send activation request for contracted flexibility
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
69dd2399-d76d-454e-a3f4-37196b34c9733c1cb605-f58c-4958-814a-7a03a043659d
2.8Send activation status
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
69dd2399-d76d-454e-a3f4-37196b34c9737063e125-31d7-42b2-a270-7a0731b1db20
2.9Send activation statusInformation when flexibilty service ended.
2.10Send measurements
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
43f73de2-a6ba-4e46-bd78-30ef0dc89bfef0340b68-b92a-4663-bed7-764f15a472d4
Scenario Name:
Bidding
Step No.Event.Name of Process/ ActivityDescription of Process/ Activity.ServiceInformation Producer (Actor)Information Receiver (Actor)Information ExchangedRequirements, R-ID
3.1Activity1
3.2Market clearing9c168352-71a9-47ae-b1af-23ca6ceb29a8
3.3Publish flexibilty need
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
9c168352-71a9-47ae-b1af-23ca6ceb29a8313976a7-d5aa-44fa-bc96-e2944b3cad70
3.4Receive and acknowledge43f73de2-a6ba-4e46-bd78-30ef0dc89bfe
3.5Receive and acknowledge69dd2399-d76d-454e-a3f4-37196b34c973
3.6Receive and acknowledge121e72c3-e0bf-4f21-8bee-75ca5af7a72d
3.7Receive call for bid43f73de2-a6ba-4e46-bd78-30ef0dc89bfe
3.8Receive flexibilty service bid9c168352-71a9-47ae-b1af-23ca6ceb29a8
3.9Send flexibility need
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
69dd2399-d76d-454e-a3f4-37196b34c973028c0c08-cef3-4d6a-9c4e-56111695b1c9
3.10Send flexibility service bid
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
43f73de2-a6ba-4e46-bd78-30ef0dc89bfe088c5de4-0f86-41f0-b2d1-05095d90ce2a
3.11Send trading results
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
9c168352-71a9-47ae-b1af-23ca6ceb29a8d62c7c1d-7a9f-4088-b6f8-4e154f5789ac
Scenario Name:
Grid prequalification
Step No.Event.Name of Process/ ActivityDescription of Process/ Activity.ServiceInformation Producer (Actor)Information Receiver (Actor)Information ExchangedRequirements, R-ID
4.1Initiate grid prequalification
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
9c168352-71a9-47ae-b1af-23ca6ceb29a85edc0deb-8121-43c5-988b-84b9e5973427
4.2Receive grid prequalification report43f73de2-a6ba-4e46-bd78-30ef0dc89bfe
4.3Receive grid prequalification request69dd2399-d76d-454e-a3f4-37196b34c973
4.4Register flexibility resource9c168352-71a9-47ae-b1af-23ca6ceb29a8
4.5Request to register flexibility resource
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
43f73de2-a6ba-4e46-bd78-30ef0dc89bfe5edc0deb-8121-43c5-988b-84b9e5973427
4.6Run grid prequalification tests69dd2399-d76d-454e-a3f4-37196b34c973
4.7Send grid prequalification report
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
9c168352-71a9-47ae-b1af-23ca6ceb29a8b731b7fb-003c-45f7-b5c3-063b225b8de8
4.8Send grid prequalification result
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
69dd2399-d76d-454e-a3f4-37196b34c9734277ff30-2470-406e-a9a2-de42dd9d1945
4.9Validate and register flexibilty resource9c168352-71a9-47ae-b1af-23ca6ceb29a8
Scenario Name:
Offering
Step No.Event.Name of Process/ ActivityDescription of Process/ Activity.ServiceInformation Producer (Actor)Information Receiver (Actor)Information ExchangedRequirements, R-ID
5.1Call for offers closed69dd2399-d76d-454e-a3f4-37196b34c973
5.2Flexibilty service offer reception69dd2399-d76d-454e-a3f4-37196b34c973
5.3Ranking and selection of offers69dd2399-d76d-454e-a3f4-37196b34c973
5.4Receive information about selected offers121e72c3-e0bf-4f21-8bee-75ca5af7a72d
5.5Receive information about selected offers43f73de2-a6ba-4e46-bd78-30ef0dc89bfe
5.6Receive the request for an offer43f73de2-a6ba-4e46-bd78-30ef0dc89bfe
5.7Send acceptance offer confirmation
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
69dd2399-d76d-454e-a3f4-37196b34c97307c2e8e9-6aa8-4ca3-8762-9fe88b6093d6
5.8Send an offer for the flexibilty service
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
43f73de2-a6ba-4e46-bd78-30ef0dc89bfebc4565f0-22d9-45b3-9c7c-85e47748934d
5.9Send the need for the flexibilty
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
69dd2399-d76d-454e-a3f4-37196b34c9731b402b9e-1938-45b1-abee-cc9aa8f14ac4
Scenario Name:
Prequalification
Step No.Event.Name of Process/ ActivityDescription of Process/ Activity.ServiceInformation Producer (Actor)Information Receiver (Actor)Information ExchangedRequirements, R-ID
6.1Publish call for flexibility servicesDSO expresses a need for a flexibilty services to prevent a congestion in the distribution grid and publishes a call to prequalificate products that meet DSO requirements.69dd2399-d76d-454e-a3f4-37196b34c973
6.2Receive prequalification decision and acknowledge43f73de2-a6ba-4e46-bd78-30ef0dc89bfe
6.3Receive prequalification information and acknowledge121e72c3-e0bf-4f21-8bee-75ca5af7a72d
6.4Receive request for prequalification69dd2399-d76d-454e-a3f4-37196b34c973
6.5Run prequalification tests69dd2399-d76d-454e-a3f4-37196b34c973
6.6Send a request for the flexibilty service prequalification43f73de2-a6ba-4e46-bd78-30ef0dc89bfe20ac9df8-68c1-4677-a482-6b26d64d6bf1
6.7Send prequalification test results and acknowledgement
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
69dd2399-d76d-454e-a3f4-37196b34c973ce6e318f-ed47-4c5c-a23d-1d3b29c5e8a9
Scenario Name:
Product prequalification
Step No.Event.Name of Process/ ActivityDescription of Process/ Activity.ServiceInformation Producer (Actor)Information Receiver (Actor)Information ExchangedRequirements, R-ID
7.1Evaluate prequalification test results9c168352-71a9-47ae-b1af-23ca6ceb29a8
7.2Publish call for flexibility service9c168352-71a9-47ae-b1af-23ca6ceb29a8
7.3Receive and acknowledge43f73de2-a6ba-4e46-bd78-30ef0dc89bfe
7.4Receive and acknowledge69dd2399-d76d-454e-a3f4-37196b34c973
7.5Receive and acknowledge121e72c3-e0bf-4f21-8bee-75ca5af7a72d
7.6Receive and forward request for flexibilty service prequalification
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
9c168352-71a9-47ae-b1af-23ca6ceb29a8a7048736-1d7f-4449-8377-84e8c1aa7a90
7.7Receive and validate request69dd2399-d76d-454e-a3f4-37196b34c973
7.8Receive prequalification test results9c168352-71a9-47ae-b1af-23ca6ceb29a8
7.9Run prequalification tests69dd2399-d76d-454e-a3f4-37196b34c973
7.10Send prequalification test results
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
69dd2399-d76d-454e-a3f4-37196b34c97322165eb0-609b-43f2-a779-3e5f48482df5
7.11Send product prequalification requirements
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
69dd2399-d76d-454e-a3f4-37196b34c97377bc39f1-f954-46a4-8d98-a4b7fcc8574c
7.12Send request for flexibilty service prequalification
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
43f73de2-a6ba-4e46-bd78-30ef0dc89bfea7048736-1d7f-4449-8377-84e8c1aa7a90
7.13Send service prequalification information
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
9c168352-71a9-47ae-b1af-23ca6ceb29a833901346-ea40-4ecf-adf9-2dbcff2e0f2a
Scenario Name:
Settlement
Step No.Event.Name of Process/ ActivityDescription of Process/ Activity.ServiceInformation Producer (Actor)Information Receiver (Actor)Information ExchangedRequirements, R-ID
8.1Calculate baseline9c168352-71a9-47ae-b1af-23ca6ceb29a8
8.2Monetiye flexibilty service9c168352-71a9-47ae-b1af-23ca6ceb29a8
8.3Receive acknowledgement9c168352-71a9-47ae-b1af-23ca6ceb29a8
8.4Receive proposed volume43f73de2-a6ba-4e46-bd78-30ef0dc89bfe
8.5Receive proposed volume69dd2399-d76d-454e-a3f4-37196b34c973
8.6Receive the bill69dd2399-d76d-454e-a3f4-37196b34c973
8.7Receive the reimbursement43f73de2-a6ba-4e46-bd78-30ef0dc89bfe
8.8Send acknowledgement
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
43f73de2-a6ba-4e46-bd78-30ef0dc89bfe1b71eaac-d551-4bfb-a37b-af4ef745d0ed
8.9Send acknowledgement
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
69dd2399-d76d-454e-a3f4-37196b34c9731b71eaac-d551-4bfb-a37b-af4ef745d0ed
8.10Send the bill
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
9c168352-71a9-47ae-b1af-23ca6ceb29a8917cf83c-b984-48bd-a15a-2b4a166866f9
8.11Send the reimbursement
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
9c168352-71a9-47ae-b1af-23ca6ceb29a8c0e04fd3-1b40-4402-aabc-5af70502ff1b
8.12Start alignement process69dd2399-d76d-454e-a3f4-37196b34c973
8.13Start volume aligment process
8.14Validate delivered volume
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
9c168352-71a9-47ae-b1af-23ca6ceb29a8774c99c4-973f-40b5-a044-5a2d4043644d
Scenario Name:
Settlement-OTC
Step No.Event.Name of Process/ ActivityDescription of Process/ Activity.ServiceInformation Producer (Actor)Information Receiver (Actor)Information ExchangedRequirements, R-ID
9.1Calculate base line69dd2399-d76d-454e-a3f4-37196b34c973
9.2Calculate delivered volume69dd2399-d76d-454e-a3f4-37196b34c973
9.3Receive acknowledgement69dd2399-d76d-454e-a3f4-37196b34c973
9.4Receive proposed volume43f73de2-a6ba-4e46-bd78-30ef0dc89bfe
9.5Receive the reimbursement43f73de2-a6ba-4e46-bd78-30ef0dc89bfe
9.6Request volume recalculation
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
4d0dcf4b-eb99-4197-9a78-3a4cf10ffe1a
9.7Send acknowledgement
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
43f73de2-a6ba-4e46-bd78-30ef0dc89bfe1b71eaac-d551-4bfb-a37b-af4ef745d0ed
9.8Send request to validate volume
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
69dd2399-d76d-454e-a3f4-37196b34c973eee9a5ec-87db-4b90-af68-174a99f9bbc8
9.9Send the reimbursement
Modsarus Use Case::InstanceName=InfoInstance
Modsarus Use Case::InstanceDescription=
69dd2399-d76d-454e-a3f4-37196b34c973c0e04fd3-1b40-4402-aabc-5af70502ff1b
9.10Volume recalculation69dd2399-d76d-454e-a3f4-37196b34c973

5. Information Exchanged

Information exchanged IDName of InformationDescription of Information ExchangedRequirement
46d6ff86-bf6a-4027-9ea4-12d3a420399cActivation acknowledgementTo confirm that activation has been executed.—-
7063e125-31d7-42b2-a270-7a0731b1db20Activation statusDSO informs TSO about successful activation of the flexibility service in the distribution grid.—-
3c1cb605-f58c-4958-814a-7a03a043659dActivation signalThis a request for activation of the contracted flexibility resource.—-
f0340b68-b92a-4663-bed7-764f15a472d4Real-time measurementMeasured active power delivered by the flexibility resource. This is time series, delivered in real-time.—-
313976a7-d5aa-44fa-bc96-e2944b3cad70Call for bidsRequest to prequalified FSP to place a bid for the flexibility service.—-
028c0c08-cef3-4d6a-9c4e-56111695b1c9Flexibility needBased on load forecast and simulation, DSO predicts the state of the distribution grid. Time intervals and volume of flexibility are determined. DSO sends a request to market operator to open a call for bids.
This request contains information about the needed flexibility service, location/area, volume, date and time interval.
—-
088c5de4-0f86-41f0-b2d1-05095d90ce2aFlexibillity service bid—-
d62c7c1d-7a9f-4088-b6f8-4e154f5789acSelected bids—-
5edc0deb-8121-43c5-988b-84b9e5973427Grid prequalification requestRequest for grid prequalification sent by FSP or flexibility resource owner. The requst contains all technical data such as:
1. Flexibility resource type
2. Connectivity (voltage level, transformer substation, DSO)
3. Location (GPS coordinates)
4. Active power
5. ….

Based on these data, flexibility resource will be registered in the flexibility register. Otherwise, grid prequalification test can be required from DSO.
—-
b731b7fb-003c-45f7-b5c3-063b225b8de8Grid prequalification reportThis is information to FSP about the grid prequalification and it is in the form of a document.—-
4277ff30-2470-406e-a9a2-de42dd9d1945Grid prequalification test resultsThis is information that DSO sends to market operator after running the grid prequalification tests. It concludes does or not flexibility resources can be registered, and used later without negative impact on the distribution grid.—-
07c2e8e9-6aa8-4ca3-8762-9fe88b6093d6Offer acceptanceInformation about accepted offers.—-
bc4565f0-22d9-45b3-9c7c-85e47748934dFlexibiltity offerOffer for the flexibility service on OTC market.
—-
1b402b9e-1938-45b1-abee-cc9aa8f14ac4Request for flexibility offer—-
20ac9df8-68c1-4677-a482-6b26d64d6bf1Prequalification requestRequest document with all the information necessary to run prequalifcation tests. These documents include:
1. Type of the DER
2. Connection information (DSO, nominal voltage, transformer substation ID, GPS location)
3. Installed power
4.
—-
ce6e318f-ed47-4c5c-a23d-1d3b29c5e8a9Prequalification informationDocument with the prequalification results.—-
a7048736-1d7f-4449-8377-84e8c1aa7a90Product prequalification requestRequest for product prequalification with accompanying documents.—-
22165eb0-609b-43f2-a779-3e5f48482df5Product prequalification test resultsResults of tests run by DSO.—-
77bc39f1-f954-46a4-8d98-a4b7fcc8574cProduct prequalification requirementsDetailed description of the flexibility service product and requirements. This is a document.—-
33901346-ea40-4ecf-adf9-2dbcff2e0f2aProduct prequalification report—-
1b71eaac-d551-4bfb-a37b-af4ef745d0edVolume acknowledgedFSP agrees with the calculated volume related to the delivered flexibility service.—-
917cf83c-b984-48bd-a15a-2b4a166866f9BillDocument, not modeled in CIM.—-
c0e04fd3-1b40-4402-aabc-5af70502ff1bReimbursementThis information is related to the sending the invoice and payment. It will not be modeled with CIM.—-
774c99c4-973f-40b5-a044-5a2d4043644dFlexibility service volumeInformation about calculated delivered volume, from the baseline and measurements.—-
4d0dcf4b-eb99-4197-9a78-3a4cf10ffe1aRecalculation requestFSP determinates the deviation in the calculated volume and requests a check of the calculation.—-
eee9a5ec-87db-4b90-af68-174a99f9bbc8Volume validation requestAfter delivered flexibility service, volume is determined based on measurements. This volume is a basis for reimbursement.
—-

6. Requirements (optional)

7. Common Terms and Definitions

8. Custom Information (optional)

KeyValueRefers to Section