EACL-PL-02

Managing flexibility delivered by DER to provide balancing services to TSO.

1. Description of the Use Case

1.1. Name of the Use Case

IDArea /Domain(s)/Zone(s)Name of the Use Case
1Poland,EACL-PL-02

1.2. Version Management

Version No.DateName of author(s)ChangesApproval status
1.22021-07-19T00:00:00Wojciech Lubczyński and Grzegorz Sawicki (PSE),NoneNone

1.3. Scope and Objectives of Use Case

ScopeBring the flexibility provided by resources connected to the distribution network (Low and Medium voltage, LV/MV) in the form of active power and/or active energy to the polish TSO balancing market.
Objective(s)Ensuring that the energy system is balanced and frequency is kept within the permitted range.
Opening a balancing market for resources connected to the distribution network (LV/MV).
Developing rules for coordination between TSO and DSO when using flexibility services.
Creating revenue opportunities for market participants for providing balancing services in the form of balancing capacity products and balancing energy.
Related business case(s)EACL-PL-01 Prequalification,
EACL-PL-03 CM&VC for DSO,
EACL-PL-04 BSP

1.4. Narrative of Use Case

Short description

The use case describes the process of purchasing flexible services in day-ahead horizon based on active power and/or active energy for TSO needs and then using these services for balancing purposes. Balancing services for TSO are procured on a continuous basis. The purchase of services takes place on Balancing Market platform according to the rules described in Terms and Conditions related to Balancing. Only Balancing Service Providers (BSPs) who have positively passed the prequalification process can offer balancing services. In case their resources are located in DSO’s grid (LV/MV) submitting bids for balancing services is only possible through the Flexibility Platform. In the day-ahead mode, it is distinguished by the acquisition of capacity (Primary Balancing Capacity Market) and balancing energy (Day-Ahead Balancing Energy Market).

Complete description

The process carried out on the Flexibility Platform in day-ahead time frame consists of the following steps: Scenario 1 – Determination of TSO needs in terms of capacity • Every morning TSO also announces information on the constraints in the network. • The Flexibility Platform Operator (FPO) takes the above-mentioned information from TSO and makes it available as soon as possible on the Flexibility Platform to interested parties. • Every morning the Flexibility Platform may also make available information on the constraints in the distribution network that may affect the technical feasibility of potential offers for balancing capacity products and balancing energy.

1.5. Key Performance Indicatiors (KPI)

IDNameDescriptionReference to mentioned use case objectives

1.6. Use case conditions

Assumptions
EACL-PL-02
Prerequisites
EACL-PL-02

1.7. Further information to the use case for classification/mapping

Relation to other use cases
Level of depth
Prioritisation
Generic, regional or national relation
National Polish Flexibility Market
Nature of the use cases
Business Use Case
Further keywords for classification
Balancing services, FSP, FSPA

1.8. General remarks

General remarks

2. Diagrams of Use Case

EACL-PL-02 Use case EACL-PL-02 BUC Balancing overview

3. Technical Details

3.1. Actors

Actor NameActor TypeActor DescriptionFurther information specific to this Use Case
Transmission System Operator (TSO)BusinessA natural or legal person who is responsible for operating, ensuring the maintenance of and, if necessary, developing the transmission system in a given area and, where applicable, its interconnections with other systems, and for ensuring the long-term ability of the system to meet reasonable demands for the transmission of electricity
Distribution System Operator (DSO)BusinessA natural or legal person who is responsible for operating, ensuring the maintenance of and, if necessary, developing the distribution system in a given area and, where applicable, its interconnections with other systems, and for ensuring the long-term ability of the system to meet reasonable demands for the distribution of electricity
Flexibility Service Provider (FSP)BusinessA natural or legal person who is a market participant providing flexibility services to any electricity market that represents and aggregates the capacity of the entities that own a distributed energy resources (DER).
Market Operator (MO) or Flexibility Platform Operator (FPO)BusinessA natural or legal person who organizes auctions (continuous auction, discrete auctions, call for tenders) between buyers and sellers of electricity-related products in the markets. Manage/operate the platform for trading (where bids and offers are collected). Clear the market and communicate results.
Balancing Service ProviderBusinessA market participant with reserve-providing units or reserve-providing groups able to provide balancing services to TSO or a market participant providing either or both balancing energy and balancing capacity to transmission system operators
Flexibility Service Provider being Aggregator (FSPA)BusinessA party who is a market participant providing flexibility services to any electricity market that represents and aggregates the capacity of the entities that own a distributed energy resources
Technical Market Operator (TMO)BusinessThe entity that is responsible for the administration of the Unit Schedule of the Balancing Market Participant in the scope commercial and technical.

3.2. References

No.References TypeReferenceStatusImpact on Use CaseOrganistaor / OrganisationLink

4. Step by Step Analysis of Use Case

4.1. Overview of Scenarios

No.Scenario NameScenario DescriptionPrimary ActorTriggering EventPre-ConditionPost-Condition
1Determination of TSO needs in terms of capacityNoneDetermination of TSO needs in terms of capacity
2Collecting offers for balancing capacity products from BSPs whose sources are located in the DSO networkNoneCollecting offers for balancing capacity products from BSPs whose sources are located in the DSO network
3Verification of technical feasibility of offers for balancing capacity products and selection of offers on the Flexibility PlatformNoneVerification of technical feasibility of offers for balancing capacity products and selection of offers on the Flexibility Platform
4Transfer of offers for balancing capacity products to the Balancing Market within the Primary Balancing Capacity MarketNoneTransfer of offers for balancing capacity products to the Balancing Market within the Primary Balancing Capacity Market
5Selection of offers for balancing capacity products on the Balancing MarketNoneSelection of offers for balancing capacity products on the Balancing Market
6Information about offers for balancing capacity products selected on the Balancing MarketNoneInformation about offers for balancing capacity products selected on the Balancing Market
7Collecting offers for balancing energy from BSPs whose sources are located in the DSO networkNoneCollecting offers for balancing energy from BSPs whose sources are located in the DSO network
8Verification of technical feasibility of offers for balancing energy and selection of offers by DSONoneVerification of technical feasibility of offers for balancing energy and selection of offers by DSO
9Transfer of offers for balancing energy to the Balancing Market within the Balancing Energy MarketNoneTransfer of offers for balancing energy to the Balancing Market within the Balancing Energy Market
10Selection of offers for balancing energy on the Balancing MarketNoneSelection of offers for balancing energy on the Balancing Market
11Information about offers for balancing energy selected on the Balancing MarketNoneInformation about offers for balancing energy selected on the Balancing Market
12Delivery of balancing capacity products and/or balancing energyNoneDelivery of balancing capacity products and/or balancing energy
13Settlements for balancing capacity products or balancing energy between TSO and BSPsNoneSettlements for balancing capacity products or balancing energy between TSO and BSPs
14Settlements for balancing capacity products or balancing energy between BSPs and FSPs and FSPAsNoneSettlements for balancing capacity products or balancing energy between BSPs and FSPs and FSPAs

Notes

4.2. Steps – Scenarios

Scenario Name:
Determination of TSO needs in terms of capacity
Step No.Event.Name of Process/ ActivityDescription of Process/ Activity.ServiceInformation Producer (Actor)Information Receiver (Actor)Information ExchangedRequirements, R-ID
Scenario Name:
Collecting offers for balancing capacity products from BSPs whose sources are located in the DSO network
Step No.Event.Name of Process/ ActivityDescription of Process/ Activity.ServiceInformation Producer (Actor)Information Receiver (Actor)Information ExchangedRequirements, R-ID
Scenario Name:
Verification of technical feasibility of offers for balancing capacity products and selection of offers on the Flexibility Platform
Step No.Event.Name of Process/ ActivityDescription of Process/ Activity.ServiceInformation Producer (Actor)Information Receiver (Actor)Information ExchangedRequirements, R-ID
Scenario Name:
Transfer of offers for balancing capacity products to the Balancing Market within the Primary Balancing Capacity Market
Step No.Event.Name of Process/ ActivityDescription of Process/ Activity.ServiceInformation Producer (Actor)Information Receiver (Actor)Information ExchangedRequirements, R-ID
Scenario Name:
Selection of offers for balancing capacity products on the Balancing Market
Step No.Event.Name of Process/ ActivityDescription of Process/ Activity.ServiceInformation Producer (Actor)Information Receiver (Actor)Information ExchangedRequirements, R-ID
Scenario Name:
Information about offers for balancing capacity products selected on the Balancing Market
Step No.Event.Name of Process/ ActivityDescription of Process/ Activity.ServiceInformation Producer (Actor)Information Receiver (Actor)Information ExchangedRequirements, R-ID
Scenario Name:
Collecting offers for balancing energy from BSPs whose sources are located in the DSO network
Step No.Event.Name of Process/ ActivityDescription of Process/ Activity.ServiceInformation Producer (Actor)Information Receiver (Actor)Information ExchangedRequirements, R-ID
Scenario Name:
Verification of technical feasibility of offers for balancing energy and selection of offers by DSO
Step No.Event.Name of Process/ ActivityDescription of Process/ Activity.ServiceInformation Producer (Actor)Information Receiver (Actor)Information ExchangedRequirements, R-ID
Scenario Name:
Transfer of offers for balancing energy to the Balancing Market within the Balancing Energy Market
Step No.Event.Name of Process/ ActivityDescription of Process/ Activity.ServiceInformation Producer (Actor)Information Receiver (Actor)Information ExchangedRequirements, R-ID
Scenario Name:
Selection of offers for balancing energy on the Balancing Market
Step No.Event.Name of Process/ ActivityDescription of Process/ Activity.ServiceInformation Producer (Actor)Information Receiver (Actor)Information ExchangedRequirements, R-ID
Scenario Name:
Information about offers for balancing energy selected on the Balancing Market
Step No.Event.Name of Process/ ActivityDescription of Process/ Activity.ServiceInformation Producer (Actor)Information Receiver (Actor)Information ExchangedRequirements, R-ID
Scenario Name:
Delivery of balancing capacity products and/or balancing energy
Step No.Event.Name of Process/ ActivityDescription of Process/ Activity.ServiceInformation Producer (Actor)Information Receiver (Actor)Information ExchangedRequirements, R-ID
Scenario Name:
Settlements for balancing capacity products or balancing energy between TSO and BSPs
Step No.Event.Name of Process/ ActivityDescription of Process/ Activity.ServiceInformation Producer (Actor)Information Receiver (Actor)Information ExchangedRequirements, R-ID
Scenario Name:
Settlements for balancing capacity products or balancing energy between BSPs and FSPs and FSPAs
Step No.Event.Name of Process/ ActivityDescription of Process/ Activity.ServiceInformation Producer (Actor)Information Receiver (Actor)Information ExchangedRequirements, R-ID

5. Information Exchanged

Information exchanged IDName of InformationDescription of Information ExchangedRequirement

6. Requirements (optional)

Category IdentifierNameDescriptionmRID
Req_IDReq_Name‘Managing flexibility delivered by DER to provide balancing services to TSO.’
IdentifierNameDescriptionmRID

7. Common Terms and Definitions

8. Custom Information (optional)

KeyValueRefers to Section